We had a lot of help during our second week of renovations and made a lot of progress.
We switched two lights and one fan out for three light and fan combos.
We took out the linoleum in the kitchen and hall bathroom. Some parts were easy, but in most areas the progress was slow.
Everyone got a chance to help remove linoleum.
Micah started trying to get the grout out of the kitchen counters, but that ended up being even slower than expected.
The kids had a ton of fun with Natalie.
We started touch up painting, and there was a lot.
In an effort to avoid removing the grout, I deep cleaned it instead and was impressed by how much better it looked.
We got the new flooring.
At the end of the week, we pulled the carpet out of the dining room. It was exciting and a big relief that both the carpet and pad pulled right up.
Unfortunately, that day ended with the discovery that the paint I used to touch up all over the house didn't quite match. The color seemed right, but the sheen was off. So I went back to Home Depot to get a new batch.
No comments:
Post a Comment